Well, after 2 months of sitting around doing nothing while my shoulder recovered from surgery it is now time to start putting the pieces back together. There is still a lot to do, but I figure with about 3 months to work with here I should be able to pull it off in time for the first ride hopefully in mid-November.

Update: Prior to June 2 (surgery day) I was able to get the front e-module and s-module installed and the motor sitting in place. Last week we got the drive axle assembly back in place with the help of a pair of functional hands from a friend. This was a difficult thing to re-install without dropping the complete suspension out. The front a-arms and shocks are installed and the brake caliper is back on, next on the list is the secondary clutch and jackshaft, followed by the gears.

As for the SnowRide site, I sure would like to get this thing rolling better for this upcoming season. It worked quite well last year to coordinate ride days, and if everyone helps by participating in posts and supplies suggestions & pictures for the site it should be good!

Later…

RSS Feed

No comments yet.

Leave a comment!

You must be logged in to post a comment.

<<

>>

Find it!

Backcountry Snowmobiling
Vernon, British Columbia, Canada